Some existing walls remained for tax reasons. This enabled project to be labeled first and second floor alterations with additions
All new sill plates attached to foundation with sill seal and copper in between
Mechanically attached to found with 3″x3″ square washers and 5/8″ nuts
2×4 & 2×6 walls constructed with 1/2″ Cdx plywood exterior
Double level headers as needed
Second floor construction mostly 3.5″x11 7/8″ tgi floor beams
All engineered lumber allow longer spans and stronger than nominal wood
BETTER HEADER installed…(2)11 7/8″ lvl with (1)3/4″x11 7/8″ steel flitch plate
Metal strapping as needed installed
for more information contact home re modelers long island

stripped house to bear studs commack long island

footing poured in front of house for future extention

footing poured in front of house for future extention

Boiler Room relocated for new footing accomodation long island

Boiler Room relocated for new footing accomodation long island

Suffolk County 27543-H1 9-10-99 to present, 15435-H1 7-1-88 to 7-1-97  Nassau County H2209100000  Southampton L002384  NYC and The Five Boroughs 1321423